Facilities Specification

Facilities

Electric Arc Furnace

  • Capacity: 700,000 TPA
  • Furnace Diameter: 5.8 Metre (NKK JAPAN)
  • Transformer Capacity: 100 MVA
  • Auto Arc System
  • Continuous Sponge Iron feeding
  • Oxy-fuel Burner
  • Eccentric Bottom Tapping
 
 

Ladle Metallurgy/Billet Caster

  • Two 1,500 cubic meter per hour oxygen plant.
  • One 80-ton ladle furnace.
  • One 4-strand continuous billet caster.
  • 6 metre Radius.
  • Auto Mould level controller.
  • High Speed Casting.
  • Sections cast 120, 125, 130, 150, 155 and 160 mm Square.
  • Mould Electro Magnetic Stirer.

Wire Rod Mill

  • 85 ton / hr. walking hearth top fired Billet reheating furnace.
  • Full continuous H-V compact cantilever ESS stands with independently driven D.C. motor.
  • Controlled water cooling system (METEC) from Morgan with most modern facilities.
  • Coil collection system on Trestles having easy down device for good coil formation.
  • With CEDA / DANIELI complete automation system for controlling rolling sequence.
  • Automatic compacting, tying and weighing system.